Potential of Floating Solar systems in India 

Syllabus: GS3/Environment 

In News

  • The recent approval of the Pradhan Mantri Surya Sarovar Yojana (PM-SSY) signals the Indian government’s intent to promote land-neutral solar applications.

Background and Need 

  • India’s solar capacity has grown from 3 gigawatts (GW) in 2016 to more than 160 GW in 2026, mostly through utility-scale projects. 
  • But with solar having to compete with urbanisation and agriculture for space, and ecological conservation a priority, land is becoming increasingly difficult to find for new projects. 
  • Therefore Policymakers are discovering ways to increase solar without requiring additional land.

Floating solar systems

  • It involves the mounting of solar modules on floating platforms over water bodies such as reservoirs and lakes. 
  • The platforms are moored to the bed or shores of the reservoir to hold them in position.
    • Depending on the system design, inverters and other electrical equipment may be located on floating platforms or onshore.
  • Floating solar systems produce electricity which is sent to land by electrical cables. 
    • Because they do not require land for installation, industrial ponds, reservoirs, and inland water bodies are ideal for the deployment of floating solar.

Benefits 

  • Land conservation:  Floating solar is an effective land use and economic advantage by reducing the demand on limited land.
  • Water Conservation: Solar panels can help reduce water evaporation, yet the amount of water saved will be dependent on the level of coverage, climate, and reservoir characteristics.
  • More efficiency: The panels are cooled with water, which means better performance and efficiency, especially during hot summers.

India’s Progress

  • NTPC Limited commissioned two of India’s largest floating solar projects in 2022: the 100 MW Ramagundam project in Telangana and the 92 MW Kayamkulum project in Kerala.
    • Another milestone project is the 600 MW Omkareshwar Floating Solar Park in Madhya Pradesh, with 278 MW capacity operating as of now. 
  • India has currently around 700 MW of floating solar electricity with a potential of 102 GW (only 20 per cent of the reservoir area being exploited).

Challenges to handle 

  • Weather-related vulnerability: Floating solar systems are exposed to extreme winds, waves, and rapidly changing water levels, making climate-resilient system design crucial. 
  • Cost:  Floating solar is generally more expensive than traditional ground-mounted solar because of the cost of floating platforms, anchoring systems, specialised electrical equipment, and installation.
    • The inclusion of energy storage systems will further increase overall capital costs. 
  • Coordination among multiple institutions (including state agencies, municipal authorities, electricity utilities, water resources and irrigation departments, environmental authorities, and industries) is complex. 

Pradhan Mantri Surya Sarovar Yojana (PM-SSY)

  • The Union Cabinet approved the Pradhan Mantri Surya Sarovar Yojana (PM-SSY), a ₹5,070 crore scheme to accelerate the development of floating solar photovoltaic (FSPV) projects integrated with energy storage systems across the country.
  • The scheme aims to develop 5,000 MW of floating solar capacity along with 10,000 MWh of co-located energy storage, providing a minimum storage duration of two hours. 
  • Projects will be sanctioned between FY 2026-27 and FY 2030-31, while financial assistance will continue to be disbursed until FY 2032-33.
  • Under the scheme, the Centre will provide Central Financial Assistance (CFA) of ₹1 crore per MW for eligible floating solar projects after successful commissioning. 

Suggestions 

  • Ecologically sensitive water bodies, as well as areas important for biodiversity, bird habitats, and fisheries, should be treated with caution and approved for floating solar development only after thorough assessments.
  • Developing clear frameworks for identifying and allocating suitable water bodies, defining institutional responsibilities, and streamlining approvals will therefore be vital for successful implementation.

Source: IE

 

Other News of the Day

Syllabus: GS2/ Governance Context The Union Ministry of Home Affairs constituted a high-level committee following a key meeting of Gorkha leaders with the Union Home Minister and West Bengal government representatives in Siliguri. What are the Roots of the Gorkhas’ Demand? The Gorkhas’ movement for a separate administrative identity is among the oldest of its...
Read More

Syllabus: GS2/ Health/ Governance Context The Union Health Ministry has proposed amendments to the Medical Devices Rules, 2017, to promote ease of doing business.  Key Proposed Amendments Simplification of Outsourced Sterilisation (Amendment to Rule 44): Manufacturers outsourcing sterilisation to a facility, holding a valid licence under the Medical Devices Rules, 2017, will no longer require...
Read More

Syllabus: GS3/Infrastructure Context The Defence Minister said that a vacuum created by the declining capacities of traditional shipbuilding industries across the world presents a major opportunity for India to emerge as a global shipbuilding hub.  About Shipbuilding It refers to the construction, repair, and maintenance of vessels used for transportation, defense, and trade.  Shipbuilding is...
Read More

Syllabus: GS3/Internal Security Context The Union Home Minister directed the security agencies to take strict measures against infiltration, asking the police chiefs to detect and deport illegal migrants.  Illegal Immigrants in India In the last three Censuses, roughly 94% of all India’s Bangladesh-born residents lived in the five border States (West Bengal, Assam, Tripura, Meghalaya,...
Read More

Syllabus: GS3/Infrastructure Context Recently, the Ministry of Civil Aviation (MoCA) gained in-principle clearance for the third wave of airport privatisation for privatising 11 Airports Authority of India (AAI) airports. About Airport Privatisation in India Airport privatisation in India is predominantly through Public-Private Partnership (PPP) arrangements with private concessionaires operating, managing and developing airports for a...
Read More

Vaishya Tekri Syllabus: GS1/History Context The Madhya Pradesh government has begun restoring Buddhist monuments linked to the Mauryan emperor Ashoka, starting with a fresh excavation at Vaishya Tekri in Ujjain. About The largest stupa, popularly called Vaisya Tekri, is about 350 feet at its base and 100 feet high. Nearby is a smaller stupa, called...
Read More
scroll to top