Sri Lanka Power Grid Collapse Raised Concerns over Grid Stabilisation

Syllabus: GS3/Renewable Energy/Infrastructure

Context

  • Recently, Sri Lanka’s national power grid collapsed and rooftop solar operators were asked to switch off their systems until further notice.
    • The directive highlighted the challenges of integrating large volumes of rooftop solar into the power grid.

About

  • The latest incident has renewed questions about how growing volumes of decentralised solar generation can be managed without compromising grid stability.
  • The issue is relevant for India, too, as it rapidly expands rooftop solar capacity, which currently stands at 33.41 gigawatts (GW).

How Rooftop Solar Systems are Connected to the Grid? 

  • Rooftop solar systems are connected to the grid through inverters, which convert the direct current generated by solar panels into the alternating current used by the power system. 
  • These inverters have built-in protection mechanisms that can disconnect the systems if grid voltage or frequency moves outside specified limits. 
  • If a large number of rooftop solar systems disconnect simultaneously, the resulting loss of generation can further destabilise the grid.

Electricity Transmission

  • Electricity generated at a power plant has to travel through transmission lines before reaching distribution networks and ultimately consumers.
    • The basic chain is: From Renewable Energy Project to Transmission Network to Distribution Network and ultimately to Consumers.
  • India’s solar and wind capacity has expanded rapidly, but transmission infrastructure in some renewable-rich regions has not kept pace.
  • This is particularly important because India’s major renewable-energy resources are concentrated in specific regions.
    • Electricity generated in these regions may have to travel hundreds or thousands of kilometres to reach major demand centres.

Current Infrastructure for Grid Transmission

  • General Network Access (GNA) Framework: It is a temporary arrangement that allows renewable energy plants to use whatever spare transmission capacity is available while they wait for their permanent transmission connection.
    • T-GNA projects, however, can schedule power only if spare transmission capacity is available. 
  • Concerns: During periods of network congestion, long-term GNA projects receive priority, often resulting in curtailment of generation from T-GNA-connected plants.
    • The curtailment faced by these projects are as high as 70-80%  of their generating capacity, posing serious concern on project viability and debt servicing.
  • When the grid cannot accommodate all the electricity being generated, power generation may have to be deliberately reduced. This is known as power curtailment.

Why are Transmission Projects Taking Time?

  • Transmission infrastructure is more complicated and time-consuming to develop than generation capacity.
  • Major challenges include:
    • Land acquisition and Right of Way (RoW) issues.
    • Obtaining environmental and other statutory clearances.
    • Delays in construction of transmission lines and substations.
    • Procurement of specialised equipment.
    • Coordination between renewable-energy developers, transmission companies and governments.
    • Mismatch between the commissioning dates of renewable projects and transmission infrastructure.
  • This creates a situation where a renewable-energy project may be ready to generate electricity while its dedicated transmission system is still under construction.

Concerns

  • Power Curtailment: Insufficient transmission capacity can force renewable-energy plants to reduce generation, resulting in wastage of clean electricity.
  • Financial Stress: Curtailment reduces revenue for renewable-energy developers, making it difficult to service project debt and potentially discouraging future investment.
  • Grid Stability: The intermittent nature of solar and wind power, combined with inadequate transmission and storage, can create challenges in maintaining grid stability and balancing electricity supply and demand.
  • Delay in Renewable Targets: Transmission bottlenecks can slow the effective utilisation of India’s rapidly expanding renewable capacity, potentially affecting the achievement of its 2030 clean-energy and climate targets.

Government Initiatives

  • Grid Integration Plan: India’s grid is being reimagined through the ₹2.4 lakh crore Transmission Plan for 500 GW, linking renewable-rich states with demand centres.
    • The Government is prioritizing investment in transmission infrastructure through the Green Energy Corridors and new high-capacity transmission lines from Rajasthan, Gujarat, and Ladakh. 
    • While these projects are multi-year efforts, once operational they will unlock over 200 GW of new renewable capacity. 
  • Vision till 2032: Government has already planned for building High-Voltage Direct Current (HVDC) corridors and boosting inter-regional transmission capacity from 120 GW to 143 GW by 2027, and 168 GW by 2032.
  • Incentives: Domestic manufacturing, incentivised through the Production-Linked Incentive (PLI) scheme, Domestic Content Requirement, imposition of duties, and duty exemptions for capital equipment, is reducing import dependency.
  • National Institute of Solar Energy (NISE): Offers training programs, workshops, and research support for solar PV, solar thermal, and hybrid technologies.
  • Capacity Building for State Nodal Agencies (SNAs): Training and technical support to state renewable energy agencies for project implementation, monitoring, and policy enforcement.
  • Research & Innovation Support: Funding for R&D in battery storage, hybrid projects, offshore wind, and green hydrogen.
  • International Cooperation & Training Programs: Collaboration with IRENA, GIZ, and other global agencies for knowledge exchange.
  • Deployment of Smart Grid Technologies: Advanced grid support technologies are planned to enhance voltage stability, improve system strength, and support reliable integration of renewable energy.

Conclusion

  • Over the past two years, policy attention has consciously shifted from pure capacity growth to system design.
  • These reforms mark a decisive step toward optimising transmission utilisation and fast-tracking stranded renewable projects, directly addressing one of the sector’s core implementation challenges.

Source: IE

 

Other News of the Day

Syllabus: GS2/Governance, GS3/Security Context Recent curbs on social media posts during protests over electoral rolls have highlighted government powers to ban content and freedom of expression in India. Legal Framework Governing Content Takedowns in India Section 69A of the Information Technology (IT) Act, 2000, empowers the Central Government to direct the blocking of public access...
Read More

Syllabus: GS1/ Society; GS2/ Social Justice Context Recently, the Supreme Court sought the Centre’s response on a PIL by a women’s organisation. It argues that the regulatory regime built after NALSA v. Union of India (2014) harms “biological females”. Key Features of the NALSA Regime Judicial foundation: NALSA recognised transgender persons as a “third gender”....
Read More

Syllabus: GS3/ Economy In News Outward remittances from India under the Reserve Bank of India’s (RBI) Liberalised Remittance Scheme (LRS) have crossed $20 billion during the first eight months of 2026. What is the Liberalised Remittance Scheme (LRS)? It was introduced by the Reserve Bank of India (RBI)  in 2004 with an initial limit of...
Read More

Syllabus: GS3/Science and Technology Context Researchers have developed an experimental therapy called CRMA-1001, which aims to silence the DNA of the Hepatitis B virus rather than directly destroying the virus. Scientists are exploring a novel approach to treat Hepatitis B using epigenetics.  What is Epigenetics? Epigenetics is the study of how cells control gene activity...
Read More

Cyberattack on Binance   Syllabus: GS3/Cyber Security  In News Binance, one of the world’s largest cryptocurrency exchanges, reportedly suffered a major cyberattack, resulting in estimated losses of $6.3 billion.  Cyberattack It is a deliberate attempt to gain unauthorized access to a computer network, computer system, or digital device.  The goal is to steal, expose, alter, disable,...
Read More
scroll to top