India’s Nuclear Programme

Syllabus: GS3/Energy Sector

Context

  • Union Minister Dr. Jitendra Singh has said that India’s nuclear programme is dedicated to peaceful purposes and not warfare, reaffirming the vision that has guided the country’s nuclear journey since its inception.
    • He highlighted that nuclear energy would play an increasingly important role in meeting India’s future energy requirements.

Status of Nuclear Power in India 

  • Installed Capacity: India has 25 active nuclear reactors with a total capacity of 8.7 gigawatt-electric (GWe). Nuclear power reactors in the country generated 56,681 million units of energy in 2024-25.
  • Consistent Contribution: Nuclear power has always contributed about 3% of India’s overall electricity production. 
  • Planned Expansion: Nuclear capacity of India to increase around 3x in next few years.
    • Through international cooperation, indigenous 700 Megawatt (MW) reactors and 1,000 MW reactors are under development, and the installed capacity is expected to touch 22.38 GW by 2031-32.
  • International Cooperation: India has signed Inter-Governmental Agreements (IGAs) on Civil Nuclear Cooperation for peaceful purposes with 18 countries, indicating the rising worldwide confidence in India’s nuclear program.
  • Reactors Under Construction: 10 reactors with around 8 GWe of capacity are under construction. Another 10 units with some 6.6 GWe of capacity are in the pre-project stage.

Need to Increase Nuclear Capacity

  • Nuclear Capacity Goal: India’s plans to increase its nuclear power capacity from the current 8,180 MW to 22,480 MW by 2031-32 and eventually 100 GW by 2047. 
  • Energy Demand Growth: India’s electricity demand is expected to increase 4-5 times by 2047, and nuclear power will help meet base-load demand alongside renewables.
  • India’s Targets: To reduce the emission intensity of its GDP by 44% by 2030 from the 2005 level.
    • To achieve 50% cumulative electric power installed capacity from non-fossil fuel-based energy resources by 2030.

India’s Three-stage nuclear programme

  • Establishment: India’s nuclear journey began shortly after Independence with the establishment of the Atomic Energy Commission in 1948. 
    • In 1956, Asia’s first research reactor, Apsara, was commissioned at the Bhabha Atomic Research Centre (BARC) in Trombay.
    • India was the second Asian nation to build a nuclear power plant in 1969 at Tarapur, just after Japan. 
  • India has a three-phase programme of nuclear power visioned by Dr Homi J Bhabha, the father of India’s nuclear programme.
  • First Stage (Pressurised Heavy Water Reactors – PHWRs): The first stage of the Indian nuclear program was the building of a fleet of PHWRs.
    • The fissile material for these reactors is natural uranium (U-238) with small amounts of U-235.
    • Deuterium oxide (heavy water) as moderator and coolant. 
    • The primary goal in this stage was to generate plutonium-239 as a by-product of uranium fuel. 
    • Plutonium-239 is a fissile material used as fuel in nuclear reactors.
  • Second Stage (Fast Breeder Reactors – FBRs): The second stage of the program is the use of Fast Breeder Reactors (FBRs).
    • FBRs are designed to work in a fast neutron spectrum and produce more fissile material than they consume. 
    • In this step, the plutonium-239 from the first stage and U-238 are used as fuel to make energy and more Pu-239 and U-233. 
    • Uranium-233 is another fissile material that can be used as fuel in nuclear reactors.
  • Third Stage Advanced Heavy Water Reactors (AHWRs): The program is expected to end with the deployment of Advanced Heavy Water Reactors (AHWRs).
    • The reactors will use thorium-232 (Th-232) as fuel, which will be used to produce U-233 and electricity. Pu-239 will be used. 
    • India has lots of thorium. The goal of this stage is to tap the potential of thorium as nuclear fuel. 

Challenges 

  • Limited domestic experience: India’s nuclear program has been primarily based on Pressurised heavy-water reactor (PHWRs) and fast breeder reactors, limiting domestic experience in Light Water Reactor (LWR) design and operation.

Light Water Reactors

  • Light Water Reactors form a mainstay of the global nuclear program currently account for over 85% of the civil nuclear reactor capacity in the world.
    • They use ordinary (light) water as both a coolant and a neutron moderator.
  • LWRs entail simpler design and engineering compared to heavy water reactors given that they use normal water as both coolant and moderator. 
  • Low Cost: It usually involves lower construction costs due to economies of scale and they are considered more thermally efficient.
  • Limited domestic uranium: India has its own stocks of low-grade uranium. It also imports uranium. The long-term growth of nuclear power depends on arrangements for fuel supplies with other countries.
  • High capital cost: Nuclear power facilities demand huge capital and long construction periods.
  • Technology Challenges: India is developing breakthrough technologies such as SMRs at an early stage.
  • Public safety and concerns: Local opposition and delays in project completion are possible due to nuclear accidents.
  • Thorium gap: Though India has large thorium reserves, commercial technology is still under development.

Government Initiatives

  • Nuclear Energy Mission & Capacity Targets: The Government has launched a Nuclear Energy Mission aimed at expanding nuclear power capacity to about 100 GW by 2047.
    • This mission emphasises enhancing domestic capabilities and adopting advanced technologies.
  • Indigenous Reactor Development: Such as Bharat Small Reactors are under development to support scalable deployment.
    • While these are PHWR and SMR variants, they lay the groundwork for a broader nuclear innovation ecosystem.
  • Three-Stage Nuclear Power Programme: India has a long-term strategy to utilise India’s thorium reserves through PHWRs, Fast Breeder Reactors and thorium-based reactors.
  • SHANTI Act, 2025: It enables capacity expansion, advanced reactor technologies and wider participation in nuclear power generation.
  • Research & Development Funding: The Union Budget 2025-26 allocated significant funding (around ₹20,000 crores) for R&D in advanced nuclear technologies.
  • International Cooperation & Tech Access: The government is working on international partnerships and technology transfer mechanisms that can help bridge experience gaps in technologies.

Way Ahead

  • India is pursuing an indigenous small reactor programme, with three types of SMR, developed by the Bhabha Atomic Research Centre for demonstration.
    • These are the 200 MWe Bharat Small Modular Reactor (BSMR-200), a 55 MWe small modular reactor (SMR), and a 5 MWt high-temperature gas-cooled reactor for hydrogen production.
    • The government has set a target of having at least five indigenously designed and operational SMRs by 2033.
  • Repurpose Old Thermal Power Sites: The government is conducting studies to repurpose old thermal power plant sites for nuclear sites.
    • Such repurposed sites may ultimately be more suitable for SMRs and smaller-capacity nuclear projects rather than large conventional reactors.
  • The indigenously designed and built Prototype Fast Breeder Reactor (PFBR) at Kalpakkam in Tamil Nadu successfully attained its first criticality in April 2026, marking the initiation of a sustained nuclear chain reaction.
    • With this achievement, India entered the second stage of its three-stage nuclear power programme. 
    • Once fully operational, India will become only the second country in the world after Russia to operate a commercial fast breeder reactor.

Source: PIB

 

Other News of the Day

Syllabus: GS1/Social Issues Context An Armoured Corps officer was issued a show-cause notice under the Army Rules, 1954, proposing administrative termination of service over allegations of adultery. What is Adultery? Section 497 of the Indian Penal Code, 1860 (IPC), recognised the crime of adultery and provided the accompanying punishment.  It defined adultery as “whoever has...
Read More

Syllabus: GS2/Governance Context The PM Internship Scheme has completed 2 years of its implementation. PM Internship Scheme  Announced in: Union Budget 2024-25. Aim: To provide real-life work experience to job seekers in top companies. Implementing Agency: Ministry of Corporate Affairs. Eligible candidates aged 18–25 (not in full-time employment) upon selection receive ₹9000/month, a ₹6000 joining...
Read More

Syllabus: GS3/Economy  In News The UDAN Scheme completed ten years and considerably expanded the regional aviation network of India by linking unserved and underserved areas. UDAN Scheme The Prime Minister of India launched the Regional Connectivity Scheme (RCS) – UDAN (“Ude Desh ka Aam Nagrik”) in 2016. It was conceptualised under the National Civil Aviation...
Read More

Syllabus: GS3/Disaster Management, Infrastructure Context A study by the Coalition for Disaster Resilient Infrastructure (CDRI) and the National Disaster Management Authority (NDMA) has identified multi-hazard vulnerabilities in telecom towers across five high-risk states of India-Assam, Gujarat, Odisha, Tamil Nadu and Uttarakhand. Key Findings of the Report The study mapped 48,416 telecom towers across Tamil Nadu...
Read More

Electrical Interconnection Between India and Saudi Arabia Syllabus: GS2/IR, GS3/Infrastructure Context India and Saudi Arabia reviewed progress on their proposed electrical interconnection initiative and discussed opportunities to expand power-sector cooperation during a virtual bilateral meeting. About The India-Saudi Arabia electrical interconnection is a proposed bilateral project to link the power grids of both nations via...
Read More
scroll to top